You must create stations so that calls can be redirected to messaging through the correct coverage path. You must create two stations to perform the initial testing of your messaging deployment.
Procedure
At the SAT interface prompt, enter add station<nnn>, where <nnn> represents the number of the extension that you want to create. This number must be within the range of extensions defined for this call center.
The system displays the Add station window.
Enter the appropriate information in the Type and Port fields.
Note
If you are unsure about what information to put in these fields, see the Completing the station screens section in the Administrator Guide for Avaya Communication Manager book.
Ensure that the Coverage Path 1 field is set to the number of the coverage path that you created while adding a coverage path for messaging.
Go to page 2.
Verify that the LWC Reception field is set to spe.
Verify that the LWC Activation? field is set to y.
Verify that the MWI Served User Type field is set to qsig-mwi.
Press the key combination Control E to save the values in the window.